Skip to main content
 

Construction Standard Change - Evaluation Worksheet

This worksheet is available for use by the PDC staff members who have been designated as the stewards of the various divisions in the MSU Construction Standards.

Original Form

Who originates it?:
IPF Staff Member
Location:
click here
Notes:
Worksheet used by Division Stewards to evaluate proposed changes.

Final Document Placement

Who is responsible?:
Other
Location:
Meridian Tasks
Notes:
The PDC Process Engineer will store the worksheet with the original form submitted by the requester.

 

Detailed Workflow

The division steward may use this worksheet to document their investigation into the suggested change, along with notes from discussions with other IPF staff members.