Cooling Load Calculations - FOR ESTIMATING PURPOSES ONLY

Spreadsheet used during the Preliminary Cost Assessment phase of project to determine an approximate capacity of air conditioning equipment.

Original Document

Who originates it?:
Estimator
Notes:
Spreadsheet is used by the mechanical estimating staff.

Final Document Placement

Who is responsible?:
FIS
Location:
Project Archives
Notes:
Records will scan into Meridian Archives

 

Detailed Workflow

During the Projected Cost Assessment (PCA) phase of a Capital Project, the Estimator will use the spreadsheet to approximate the capacity of proposed air conditioning equipment for the project.  The Estimator will save the spreadsheet in Active Projects, then print out a hard copy to be placed in the project folder.  The project folder is given to PDC Administrative Support when the PCA is issued.  PDC Administrative Support will give the project folder to Facilities Information Services to scan into Meridian Archives.