Drawings - Change Management

Change Orders during construction may  include drawings.

Original Document

Who originates it?:
Lead Designer,Consultant

Final Document Placement

Who is responsible?:
Project Representative,Project Manager
Location:
Unifier Document Manager
Notes:
Move from the "TRANSMITTALS TO BE FILED" folder to the "DRAWINGS / CHANGE MANAGEMENT" sub-folder.

 

Detailed Workflow

During construction, if a change order is required, the Change Management process in Unifier is used to document the change, both to the construction plans and to the budget.  The Change Order may include attached drawings to assist in describing the work scope.  The Project Representative or Project Manager is responsible for moving the approved attached drawings to the appropriate folder in the project Document Manager in Unifier.