Skip to main content
 

Presentations (for CJ, CIPWG and BOT)

Graphical materials about the project provided for review at Construction Junction, CIPWG and Board of Trustee Meetings.

Original Form

Who originates it?:
Lead Designer,Consultant
Notes:
Use the Capital Project Information Sheet (A3) and the CIPWG/BOT Presentation - Powerpoint Templates when creating presentation materials.

Final Document Placement

Who is responsible?:
Lead Designer
Location:
Unifier Business Process
Notes:
Presentations are attached in the CJ, CIPWG and BOT processes.

 

Detailed Workflow

Graphical materials are required to be included when presenting a major project for review at a Construction Junction, Campus Infrastructure Work Group meeting or a Board of Trustees meeting.  The Consultant will create the materials and submit them for review by the Lead Designer, the Customer and other project Team Members.  The Lead Designer will include the presentation materials as attachments to the CJ, CIPWG and BOT processes in Unifier.