Skip to main content
 

Trade Specific Construction Representatives Review Transmittal

The Trade Specific Construction Representative Review Transmittal is attached to two sets of documents (drawings and specifications) issued for review by the Construction Representative Crew and other plan reviewers.

Original Form

Who originates it?:
Lead Designer
Location:
click here
Notes:
This form is available for PDC Staff to access in Meridian Forms, and use as a template for a new project.

Final Document Placement

Who is responsible?:
Lead Designer
Location:
Unifier Document Manager
Notes:
Upload into the "Infrastructure Planning and Facilities Services" folder.

 

Detailed Workflow

When design documents are ready for review, the Lead Designer fills out the Trade Specific Construction Representatives Review Transmittal  form and attaches the form to the project documents, including one set of drawings and specifications.  The Lead Designer files the form and the design documents in the Document Manager in Unifier.  The form and design documents are placed in the Construction Representatives mailbox in the PDC Administrative Support area.  The Trade Specific Construction Representatives and other plan reviewers input their comments into the Plan Review process in Unifier.